Map: Projected permanent and temporary tunnel locations

LOD - Options 2-3 Graphic R10-13-13 FLAT - sm

Click here to see a larger version of this very detailed map of the possible “Limits of Disturbance”: LOD – Options 2-3 Graphic  Providing detail not found in the above CSX map, this graphic illustrates proposed temporary tunnel locations and the location of the proposed permanent tunnel under two of the potential construction scenarios. See our Impact  on You and Resources pages for more information.